| |
SHALINI ENTERPRISES is
fully equipped with all kinds of plant & machinery for
the process of solvent distillation. The capacity of
installed machinery is 200 KL / month.
Plant & Machinery
1. There are two reactors of 1000 KL capacity. One of MS
and other
One SS at a column height of 30’
2. A cooling Tower of 100 TR
3. Vacuum Pump
4. Wood Fired Boiler
| |
|
|
|
|
| |
 |
|
 |
|
| |
Reactors |
|
Firewood Boiler |
|
| |
|
|
|
|
| |
 |
|
 |
|
| |
Water
cooling Pump |
|
Storage
of Residue |
|
| |
|
|
|
|
| |
 |
|
 |
|
| |
Front
View |
|
Rear
View |
|
Power
The unit having 25 HP Power obtained from KPTCL since
the unit is the heart of approved Peenya Industrial
Area, the authorities are anticipating no problem in
getting regular and uninterrupted power supply.
In addition to the above, we write to inform that M/S.
THERELEK ENGINEERS (P) LIMITED, Peenya, Bangalore has
authorized us to carry out incineration of Non –
Hazardous Scrap vide Ref No. TE: SE: 04:05:523 dated
06.10.2004 and asked to take necessary efforts for
collection of wastes.
Safety
SHALINI ENTERPRISES concentrates more on safety of
machinery & men working in the unit. Certain safety
measures taken by the unit are outlined below:
1. Fire extinguish equipments have been fixed at the
appropriate places to face
The emergency in case of need. The instructions for the
operation of fire
Extinguishers are noted on the equipments itself.
2. Staff and employees have been trained on Fire
Fighting.
3. The vehicles used for transportation of materials are
also equipped with
Fires extinguish equipments.
|
|